The sewer system runs beneath the Yarra River, extending from Westgate Park in Port Melbourne to Scienceworks in Spotswood.
This initiative involves the construction of an additional sewer line to enhance the flow capacity of the existing system, forming a crucial part of a comprehensive Melbourne Water program aimed at addressing the challenges posed by aging infrastructure throughout the city.
WHEN
Since February 2022, the project team has established two construction sites at Scienceworks and Westgate Park.
Read more
Our works included:
- All site establishment works
- Installation and wiring of pipejack drive machines (Lucey), assembled, and commissioned
- Project wide site emergency lighting, site flood lighting to meet AS3012 requirements.
- Construction wiring throughout the tunnel sites and Tunnel including all underground lighting, evacuation system, Construction boards, Test and tag.
- Provide Shift maintenance technicians for support during tunnel excavation, assembly and disassembly of the pipejack drive.
- Tunnelling site dewater system and water treatment plants
- Design and install bentonite/polymer plant for Bauer.
- Relocation of Melbourne waters existing electrical assets.
WHEN
Since February 2022, the project team has established two construction sites at Scienceworks and Westgate Park.
Read more
Our works included:
- All site establishment works
- Installation and wiring of pipejack drive machines (Lucey), assembled, and commissioned
- Project wide site emergency lighting, site flood lighting to meet AS3012 requirements.
- Construction wiring throughout the tunnel sites and Tunnel including all underground lighting, evacuation system, Construction boards, Test and tag.
- Provide Shift maintenance technicians for support during tunnel excavation, assembly and disassembly of the pipejack drive.
- Tunnelling site dewater system and water treatment plants
- Design and install bentonite/polymer plant for Bauer.
- Relocation of Melbourne waters existing electrical assets.