Metro Tunnel

  • Location

    125-133 Swanston Street, Melbourne

  • Builder

    CYP Joint Venture

WHY US

Trusted partner for over 20 years of industry excellence.

The $10.9 billion Metro Tunnel project will create nine kilometres of twin tunnels and five new underground stations at Arden, Parkville, CBD North, CBD South, and Domain, establishing a dedicated pathway for two of Melbourne’s busiest rail lines.

M Squared Electrical were appointed as the electrical contractor for the first package of the Metro Tunnel Early Works. The company was engaged by the principal contractor, John Holland, to assist with the design and implementation of both temporary and permanent power requirements for the two acoustic sheds located at Becket Street and Franklin Street in the CBD.

WHO

M Squared Electrical is staffing the site 24 hours a day with rotating shifts.

Read more
  • All site establishment works which include all crib and site amenities,
  • Installation and wiring of 2 x Herrenknecht Tunnel boring machines 
  • Tunnelling Industrial and potable water pump systems and controls
  • Project wide site emergency lighting, site flood lighting to meet AS3012 requirements.
  • Construction wiring throughout the tunnel sites and Tunnel including all underground lighting, evacuation system, Construction boards, Test and tagTunnelling site dewater system and water treatment plants
  • Provide Shift maintenance technicians for support during tunnel excavation, assembly and disassembly of the Tunnelling machines.

Let me know if you need more info

WHO

M Squared Electrical is staffing the site 24 hours a day with rotating shifts.

Read more
  • All site establishment works which include all crib and site amenities,
  • Installation and wiring of 2 x Herrenknecht Tunnel boring machines 
  • Tunnelling Industrial and potable water pump systems and controls
  • Project wide site emergency lighting, site flood lighting to meet AS3012 requirements.
  • Construction wiring throughout the tunnel sites and Tunnel including all underground lighting, evacuation system, Construction boards, Test and tagTunnelling site dewater system and water treatment plants
  • Provide Shift maintenance technicians for support during tunnel excavation, assembly and disassembly of the Tunnelling machines.

Let me know if you need more info

WHAT

Assist with designing and implementing power requirements for the acoustic sheds.

Read more
Standing 25m above traffic, the 114m long, 1,280t launching gantry is certainly the largest piece of equipment on the whole project. The automatic "twist lock" connecting system allows to lift and hang deck segments in a matter of minutes without manual intervention nor need to access the segment, greatly improving safety and productivity. All the parameters of the PLC controlled machine can be accessed and adjusted remotely.
  • Site establishment works
  • Coordination with overseas manufacturer
  • Providing highly skilled technicians for launch Gantry machine assembly and build.
  • Our experienced electricians were responsible for wiring, testing, and commissioning
  • On going maintenance
WHAT

Assist with designing and implementing power requirements for the acoustic sheds.

Read more
Standing 25m above traffic, the 114m long, 1,280t launching gantry is certainly the largest piece of equipment on the whole project. The automatic "twist lock" connecting system allows to lift and hang deck segments in a matter of minutes without manual intervention nor need to access the segment, greatly improving safety and productivity. All the parameters of the PLC controlled machine can be accessed and adjusted remotely.
  • Site establishment works
  • Coordination with overseas manufacturer
  • Providing highly skilled technicians for launch Gantry machine assembly and build.
  • Our experienced electricians were responsible for wiring, testing, and commissioning
  • On going maintenance